BEP (BIM Execution Plan)
The BIM Execution Plan (BEP) defines how a project team collaborates with BIM: who delivers which information, when, in what quality and in which format.
In German-speaking countries the BEP is known as BAP (BIM-Abwicklungsplan). It is the project team’s response to the client’s Exchange Information Requirements (EIR, in German: AIA). While the EIR describe which information the client needs, the BEP sets out how the team will meet these requirements.
What is in a BEP?
A BEP describes the rules of digital collaboration. Typical contents include:
- Project goals and BIM use cases, such as as-built surveys, clash detection or quantity take-off
- Roles and responsibilities, for example BIM management, BIM coordination and authors of the discipline models
- Modelling guidelines: level of detail, coordinate system, naming and model structure
- Data exchange: formats such as IFC and BCF, delivery dates and quality checks
- Software, common data environment (CDE) and the schedule of model deliveries
The BEP is a living document: it is agreed at the start of the project and updated whenever participants, requirements or processes change.
BEP and EIR: how they work together
EIR and BEP belong together. The EIR state the “what” from the client’s perspective, the BEP the “how” from the project team’s perspective. Guidance on content and structure is provided by the ISO 19650 series and, in Germany, by guideline VDI 2552 Part 10, among others.
The BEP in projects on existing buildings
In refurbishment, renovation or conversion projects, every design starts with the existing building. The BEP should therefore also define how the current condition is captured: with which method, such as 3D laser scanning, with what accuracy, in which coordinate system and in which formats the point cloud and as-built model are delivered. The clearer these requirements are, the more smoothly the existing-building data can be used in design.
Common mistakes in a BEP
- The BEP is written once and never updated.
- Requirements are too general, such as a blanket level of detail without specifying which components carry which information.
- Existing-building data is not addressed, although all disciplines build on it.
- Responsibilities for model checking and approval are missing.
How Scala X supports you
Scala X provides the existing-building basis for BIM projects: point clouds, 360-degree images and BIM models of the current condition. We are happy to agree the requirements for the survey with you in advance so that the data fits your BEP. Learn more about SCAN4DOCUMENTATION.
Frequently asked questions about the BEP
What is a BEP?
A BEP (BIM Execution Plan) is the central document that governs collaboration in a BIM project: goals, roles, modelling requirements, data exchange and schedule.
Who prepares the BEP?
As a rule, the project team – usually the contractor’s BIM management – prepares the BEP in response to the EIR. The client reviews and approves it.
What is the difference between BEP and BAP?
There is none: BAP (BIM-Abwicklungsplan) is the German term for the BIM Execution Plan.
Is there a template for a BEP?
Templates and samples exist, for example from BIM Deutschland. A good BEP, however, is always tailored to the specific project and its BIM use cases.