Lexicon › CDE
CDE (Common Data Environment)
A CDE is the shared digital data environment of a project: all models, drawings and documents in one place – versioned, with clear access rights and traceable approvals.
The term Common Data Environment comes from the ISO 19650 series of standards. A CDE is less a specific piece of software than an agreed process supported by a suitable platform. The goal is a “single source of truth”: everyone involved works with the same, current information.
How does a CDE work?
Information passes through defined states in the CDE. ISO 19650 distinguishes four areas:
- Work in progress: data a team is currently working on
- Shared: checked data made available to other parties for coordination
- Published: approved data, for example for construction or operation
- Archived: completed versions that remain traceable
Every change of state involves a check or approval, so it is always clear which version is valid.
What belongs in a CDE?
A CDE holds all information relevant to the project: BIM models, for example in IFC format, and drawings, point clouds and 360-degree images from the building survey, documents such as reports, minutes and data sheets, as well as tasks and check results, for example from clash detection in BCF format.
The CDE for existing buildings
A central data environment pays off for existing buildings too. Point clouds and as-built models are the basis for all further design work and should therefore be stored in the CDE from the start and be accessible to everyone involved. Large point clouds are often provided through web-based viewers, so nobody has to download gigabyte-sized files. When the project is complete, the approved data flows into the Asset Information Model for operation.
Benefits of a CDE
- No conflicting versions sent by email or stored on local drives
- Traceability: who changed and approved what, and when?
- Less coordination effort and fewer errors on site
- Seamless handover of data to operations
How Scala X supports you
Scala X provides existing-building data that fits into your data environment: point clouds in common formats, BIM models and 360-degree images that let you walk through your building online. Learn more about SCAN4DOCUMENTATION.
Frequently asked questions about the CDE
What does CDE stand for?
CDE stands for Common Data Environment: the central place where all project information is stored, checked and approved.
Is a CDE a piece of software?
Not only. A CDE consists of processes, rules and a platform. Specialised CDE platforms exist; what matters is that states, approvals and access rights are clearly defined.
Which standard governs the CDE?
The basis is the ISO 19650 series. In addition, the German DIN SPEC 91391 describes requirements for CDE platforms.
Who is responsible for the CDE?
Usually the client specifies in the EIR which CDE is to be used. Setup and rules are described in the BIM Execution Plan (BEP), and BIM management often handles administration.
Related terms
AIM (Asset Information Model) · BEP (BIM Execution Plan) · IFC · Clash detection · Point cloud
You can find all terms in our lexicon. Would you like to digitize your building? Get in touch.